Energy Sites DataBuy the list
Home › Battery, solar and wind
Edition 26 November 2026 · updated quarterly

Renewable energy projects in the UK

Our database of renewable energy projects in the UK has 13,283 battery storage, solar and wind projects, from 2,445 operational sites to 6,380 consented or under construction and every application in the planning system. Each comes with its capacity, planning dates, location, grid connection where we can match it, and the developer company with its parent from Companies House.

  • Excel + CSV
  • MW, status, planning dates
  • Grid connection
  • Developer + parent company
UK battery, solar and wind list
13,283projects
6,380in the pipeline
174 GWpipeline capacity
One-off £795With quarterly updates £1,195/yrPacks from £165+ VAT
See prices and buy
Official public registersREPD, DNO registers, NESO, Ofgem, LCCC, Companies House
Open Government LicenceOGL v3.0 and open data licences
Updated quarterlyRebuilt after each REPD release
Emailed within 15 minutes7am–10pm; overnight orders by 7:15am
Secure Stripe checkoutCard payment, VAT receipt

What you get

  • Every battery storage, solar PV and onshore and offshore wind project of 150 kW or more in the government's Renewable Energy Planning Database: 13,283 projects across England, Scotland, Wales, Northern Ireland and UK waters
  • Every planning status: 2,445 operational, 6,380 consented or under construction, 1,386 awaiting a planning decision, plus refused, withdrawn and abandoned schemes
  • Capacity in MW, planning authority, application reference and every planning date (submitted, granted or refused, appeal, construction, operational)
  • Address, county, region, postcode and map coordinates; turbine numbers and heights for wind, mounting and site area for solar, stand-alone or co-located for batteries
  • Grid connection where we can match the network registers (1,147 projects): export and import capacity, voltage, substation, connection status and date
  • Ofgem output for 1,087 operating wind and solar sites and the CfD contract for 366 projects (round, strike price, delivery year)
  • The developer or operator, with Companies House number, status, registered office, SIC codes, directors and parent company for 6,492 projects

Grid, output and CfD details are matched from separate registers and labelled High or Medium confidence. No email addresses or phone numbers.

Prices for the UK battery, solar and wind project list

The annual plan suits anyone working the pipeline: every quarter hundreds of projects are submitted, consented, start building or switch on, and the changes file tells you which.

Battery, solar and wind list + quarterly updates

The full list now, then a fresh list every quarter for a year, with what changed

£1,195 a year

+ VAT (£1,434) a year

  • The full UK battery, solar and wind list now (Excel + CSV)
  • 4 quarterly updates over the year
  • A changes file each quarter: new projects and status changes
  • Change vs last refresh column in every file
Subscribe

For £400 more than the one-off list you get the next four quarterly editions, each with a changes file. Renews yearly; cancel any time and keep the files you have had.

UK battery, solar and wind project list

Every UK battery storage, solar and wind project today, one-off

£795

+ VAT (£954), one-off

  • Every UK battery, solar and wind project (Excel + CSV)
  • Capacity, status, planning dates, grid connection
  • Developer company, Companies House details and parent company
Buy now

One edition, dated 26 November 2026. No updates.

13,283 projects in the current edition. Pay by card through Stripe. Your files are emailed as a zip (Excel and CSV) within 15 minutes between 7am and 10pm; overnight orders arrive by 7:15am. Prices are plus VAT, which is added at checkout. You get a VAT receipt. For business buyers only; licensed for use in your own business.

What's in the fileReal column headings; cells shown as placeholders
uk-renewable-sites.xlsx91 columnsASite nameBTechnologyCCapacity MWDStatus+87 more2345678Projectsuk-renewable-sites.xlsx (more columns)91 columnsAExport capacity MWBImport capacity MWCConnection voltage kV+88 more2345678Projects

See real rows in the free sample (directors' names removed).

Packs: one technology, or just the pipeline

Battery storage 2,756 projects, £165; Solar farm 7,640 projects, £458; Wind farm 2,887 projects, £173; pipeline (consented and under construction) 6,380 projects, £479 (+ VAT, one-off).

PackProjectsPrice + VATBuy
Battery storage projects pack2,756£165Buy
Solar farm projects pack7,640£458Buy
Wind farm projects pack2,887£173Buy
Pipeline pack: consented and under construction6,380£479Buy

A pack is 6p a project (7.5p for the pipeline pack), with a minimum of £149, plus VAT, worked out from the current edition. It has the same columns as the full list, for those projects only. One-off: no quarterly updates. The pipeline pack is every battery, solar and wind project that is consented or under construction. Emailed within 15 minutes between 7am and 10pm; overnight orders arrive by 7:15am.

What is in the renewable energy projects list

13,283battery, solar and wind projects
48.6 GWoperational across 2,445 sites
173.5 GWconsented or under construction
6,492with the developer's company number

One row per project as the REPD records it, with the answers a contractor, supplier or investor needs before picking up the phone:

What you getProjectsWhere it comes from
The project: name, technology, capacity, status and date, planning authority, application and appeal references, every planning date13,283Renewable Energy Planning Database (DESNZ), 12,076 with a capacity
Where it is: address, county, region, postcode, coordinates13,252REPD grid references; nearest postcode from postcodes.io for 2,320 that had none
Grid connection: export and import MW, voltage, substation, status, date1,147Distribution network operators' embedded capacity registers; NESO TEC register (labelled match)
What it generates: output in MWh over a year1,087Ofgem Renewables and CHP Register (Renewables Obligation certificates, April 2025 to March 2026)
Its subsidy contract: CfD round, contract MW, strike price, delivery year366Low Carbon Contracts Company CfD register and auction results
Who's behind it: company number, status, registered office, SIC codes, directors, parent company6,492Companies House (strict match; parent company from the register of people with significant control, companies only: 4,630)

Renewable energy projects by technology

Solar has the most projects (7,640), many of them large rooftops and small ground-mounted farms, but battery storage has the most megawatts in the planning system: 153.9 GW across 2,756 projects. Offshore wind has only 111 projects but they average 465 MW each (median). More on battery storage sites, solar farms and wind farms.

TechnologyProjectsMW (all statuses)OperationalConsented or buildingAwaiting decision
Battery storage2,756153,8881871,526464
Solar PV7,64070,1201,4244,377622
Onshore wind2,77662,304785438287
Offshore wind11180,635493913
All13,283366,9482,4456,3801,386

Projects by technology

13,283projects
  • Battery storage2,756
  • Solar PV7,640
  • Onshore wind2,776
  • Offshore wind111

Renewable energy projects by planning status

6,380 projects (173.5 GW) have planning consent or are being built: that's the pipeline most suppliers want, and it's listed by region and quarter on new renewable energy projects.

Projects by planning status

13,283projects
  • Operational2,445
  • Consented or building6,380
  • Awaiting decision1,386
  • Refused, withdrawn or lapsed3,072

Projects in each UK nation

NationAllBattery storageSolar PVOnshore windOffshore windOperational MWPipeline MW
England9,5601,9996,710851017,04788,034
Scotland2,3565474931,309711,88735,867
Wales76115937123012,2116,693
Northern Ireland502516538601,4351,878
Offshore10300010316,01141,072

Offshore means offshore wind farms in UK waters, which the REPD records under "Offshore" rather than a nation. Pipeline is consented or under construction.

Every UK battery, solar and wind project in one spreadsheet13,283 projects with capacity, status, planning dates, grid connection and developer company. Or £1,195 a year for quarterly updates.
See prices and buy

Grid connection data

A planning consent is only half a project: it also needs a grid connection. We match each project to the network operators' embedded capacity registers (distribution-connected sites of 1 MW or more) and the NESO transmission entry capacity register, by technology, location and capacity, and label every match High or Medium. That gives the export capacity, the import capacity a battery can draw, the connection voltage and substation, and the connection status and date.

Grid detailProjectsShare
Grid match (any)1,1479%
Distribution network (embedded capacity registers)6825%
Transmission (NESO TEC register)4654%
Export capacity MW1,1479%
Import capacity MW3252%
Connection voltage6765%
Substation1,1459%
Connection date6695%

Grid registers list connection offers as well as built connections, and don't share an ID with the REPD, so a project can be missing a match if the register describes it differently. 731 matches are High confidence (same technology within 1 km, export capacity within 25%).

Output and CfD contracts

1,087 operating wind and solar sites are matched to Ofgem's register, with the electricity they were issued Renewables Obligation certificates for between April 2025 and March 2026: 20.2 million MWh in total. 366 projects hold a Contract for Difference from the Low Carbon Contracts Company, with the allocation round, contract capacity and strike price (351 with a strike price, in the round's base-year prices).

Developer and operator companies

The REPD names 5,654 different operators or applicants. Many projects sit in their own special purpose company, so the list adds the company's parent from the Companies House register of people with significant control (companies only, never individuals) for 4,630 projects. The companies with the most projects in the list, by their Companies House name:

#Company (Companies House name)Projects
1AMP CLEAN ENERGY LIMITED383
2LIGHTSOURCE RENEWABLE ENERGY LIMITED181
3SOLAR OPTIONS FOR SCHOOLS LIMITED116
4SAINSBURY'S SUPERMARKETS LTD99
5ANESCO LIMITED92
6ENERGIEKONTOR UK LTD78
7SCOTTISHPOWER RENEWABLES (UK) LIMITED75
8AMP ENERGY SERVICES LIMITED60
9EDF ENERGY RENEWABLES LIMITED52
10DAVID LLOYD LEISURE LIMITED46

Counts are projects whose REPD operator name matched that company; a group trading through many SPVs appears under each SPV's own name.

Free sample

Download 20 real rows from the list, spread across the four technologies, the planning stages and the nations, picked to show the grid, output, CfD and company columns filled in. Directors' names have been removed from the free sample; the full list includes the directors of each operating company from Companies House. Across the whole list these columns are less complete than in the sample: see how complete it is.

Some of the rows in the sample:

SiteTechnologyStatusRegionMW
Bowenhurst Farm, Mill Lane - Battery Energy StorageBattery storageAwaiting decisionSouth East100.0
Hawthorn Grid Site - Battery StorageBattery storageOperationalNorth East49.0
Meadowville, Hull Road - Battery Energy Storage SystemBattery storageConsented, not yet builtYorkshire & Humber48.0
Old Hall Farm, Lackenby - BESSBattery storageAwaiting decisionNorth East244.0
Middleton Of Blackhills, Rothienorman - Battery Energy Storage SystemBattery storageAwaiting decisionScotland49.9
Pembroke Power Station, Pwllcrochan - Battery StorageBattery storageConsented, not yet builtWales350.0
Battens Farm Solar ParkSolar PVOperationalSouth West11.0
Corner Copse Solar FarmSolar PVUnder constructionSouth West49.9

All the columns

The file has 91 columns. The Excel version has a Columns sheet explaining each one, and an About sheet with the sources and licences.

How complete the list is

DetailProjectsShare
Capacity (MW)12,07691%
Planning authority13,276100%
Planning application reference12,87297%
Map coordinates13,252100%
Postcode12,81696%
Grid connection match1,1479%
Import capacity (MW)3252%
Ofgem output (operational wind and solar)1,08648% of 2,258
CfD contract3663%
Companies House number6,49249%
Parent company4,63035%

Company numbers: 4,139 High matches (the exact registered name, or a name word plus a registered office at the site's postcode) and 2,353 Medium (a brand name that is exactly the name of an active energy, construction or holding company). Postcodes for 2,320 projects are the nearest postcode to the REPD grid reference, flagged in the Postcode source column. Storage MWh is only where a grid register gives it (8 projects).

Using the data

The files are for your own business use: you can't resell or publish them. Directors are named as they appear on the public Companies House register. You can contact companies about things relevant to their business on a legitimate-interests basis: say who you are and where you got their details, offer an opt-out and honour it. 5,965 projects have an operator that may be an individual, a partnership, a public body or an unmatched name, and the file flags them: don't send them unsolicited marketing emails. Read the terms and our legitimate-interests note.

Questions about the battery, solar and wind list

What exactly am I buying?

A spreadsheet (Excel and CSV) with one row for every battery storage, solar PV and onshore or offshore wind project of 150 kW or more in the government's Renewable Energy Planning Database: 13,283 projects in the current edition, dated 26 November 2026. Each row has the site, technology, capacity, planning status and dates, planning authority and application reference, address, postcode and coordinates, the grid connection where we can match it, Ofgem output, any CfD contract, and the developer or operator with its Companies House details and parent company.

Which statuses are included?

All of them. 2,445 projects are operational, 6,380 are consented or under construction, 1,386 are waiting for a planning decision, and the rest were refused, withdrawn, abandoned, decommissioned or have lapsed. The Status column says which, with the date, so you can filter to the stage you sell into. The pipeline pack has only the consented and under-construction projects.

Where does the data come from?

The Renewable Energy Planning Database (REPD) published every quarter by the Department for Energy Security and Net Zero, matched to the distribution network operators' embedded capacity registers and the NESO transmission entry capacity register (grid connection), Ofgem's Renewables and CHP Register (output), the Low Carbon Contracts Company CfD register, Companies House and postcodes.io. The sources page explains each one and how rows are matched.

How accurate is the grid connection data?

Grid details come from separate registers that don't share an ID with the REPD, so we match them by technology, location and capacity and label each match. A High match (731 projects) is a register entry of the same technology within 1 km of the REPD grid reference with an export capacity within 25%. Medium matches are within 3 km and 40%, or a transmission project matched by name and capacity. 1,147 projects have a grid match in this edition.

Does it include battery import capacity?

Where the network operator publishes it, yes: 325 projects have an import capacity in MW, including 119 battery projects, which matters because a battery charges from the grid. Storage size in MWh is only in the file where a register gives it (8 projects); the REPD itself doesn't record MWh.

What's the difference between the full list, the annual plan and the packs?

The full list (£795 + VAT (£954)) is today's edition of every project. The annual plan (£1,195 a year + VAT (£1,434)) adds a fresh edition every quarter for a year after each REPD release, with a changes file listing new projects and status changes. Packs are one-off subsets priced at 6p a project (7.5p for the pipeline pack) (minimum £149): battery storage, solar, wind, or the pipeline.

How up to date is it?

This edition is dated 26 November 2026 and uses the REPD release published on 13 November 2026 (data to the end of September 2026), with the grid, Ofgem, CfD and Companies House data downloaded on the same day. We rebuild it every quarter after the next REPD release; the next edition is due in February 2027.

Does the free sample include directors?

No. Directors' names have been removed from the free sample: its Directors column says 'Removed in the free sample'. Every other column is exactly as in the paid file, and the full list includes the directors of each operating company from Companies House.

Can I use it for marketing?

Yes, for business-to-business contact, if you follow the rules. Many developers run each project through its own company (an SPV), so the file gives the parent company from the Companies House register where there is one. You can contact companies about things relevant to their business on a legitimate-interests basis: say who you are, give an easy way to opt out and honour it. 5,965 projects have an operator we couldn't confirm as a company, and the file flags them: don't send those unsolicited marketing emails.

Why do some projects have no company number?

The REPD records the operator or applicant as a free-text name, often a brand or group name rather than the registered company. We only add a Companies House number on a strict match: the exact registered name, a brand name that is exactly the name of an active energy, construction or holding company (labelled Medium), or a name word plus a registered office at the site's postcode. 6,492 projects (49%) have a company number; the rest keep the REPD name and a note on the likely entity type.

How do I get the files?

Pay by card on the Stripe checkout page. The files are emailed to you as a zip within 15 minutes between 7am and 10pm (UK time); orders placed overnight arrive by 7:15am. Your VAT receipt comes separately from Stripe.