Energy Sites DataBuy the list
Home › FAQ
Edition 26 November 2026

AD plant list FAQ

AD plant list FAQ: answers to the questions buyers ask most about our list of 638 UK anaerobic digestion plants, from what's in the file and how it's delivered to the quarterly updates and what you can do with the data.

  • Excel + CSV
  • Capacity and output
  • Operator + Companies House
  • Quarterly updates
UK AD plant list
638AD plants
680MWe known
51gas to grid
One-off £349With quarterly updates £495/yr+ VAT
See prices and buy
Official public registersEA, SEPA, Ofgem, REPD, Companies House
Open Government LicenceOGL v3.0 public data
Updated quarterlyRebuilt after each REPD release
Emailed within 15 minutes7am–10pm; overnight orders by 7:15am
Secure Stripe checkoutCard payment, VAT receipt

Questions about the AD plant list

What exactly am I buying?

A spreadsheet (Excel and CSV) with one row for each anaerobic digestion plant we can identify in the UK: 638 in the current edition, dated 26 November 2026. Each row has the site, address, postcode and coordinates, the operator and its Companies House details, capacity, Ofgem output, an estimated feedstock tonnage, the biomethane-to-grid flag, permit details, an AD confidence rating and the sources.

What's the difference between the one-off list and the annual plan?

The one-off list (£349 + VAT (£418.80)) is today's edition only. The annual plan (£495 a year + VAT (£594)) gives you today's edition and then a fresh edition every quarter for a year, each with a changes file listing new plants, closed plants and plants whose capacity, operator or company changed.

How up to date is it?

This edition is dated 26 November 2026. We rebuild it every quarter after the government publishes the new Renewable Energy Planning Database, re-reading the permit registers, Ofgem and Companies House at the same time. The next edition is due in February 2027.

Are the feedstock tonnes real figures?

No. They're our estimate, worked out from each plant's electrical capacity or Ofgem output and a typical energy yield per tonne. They're useful to rank and size plants, not a fact about any one site. 479 plants have an estimate; sewage sludge and industrial effluent plants don't. The capacity and feedstock page explains the method.

Does it include email addresses or phone numbers?

No. The registers don't publish them, and we don't add them. You get the operating company, its registered office and its directors from Companies House, which is usually enough to find the right contact.

Does the free sample include directors?

No. Directors' names have been removed from the free sample: its Directors column says 'Removed in the free sample'. Every other column is exactly as in the paid file, and the full list includes the directors of each operating company from Companies House.

How do I get the files?

Pay by card on the Stripe checkout page. The files are emailed to you as a zip within 15 minutes between 7am and 10pm (UK time); orders placed overnight arrive by 7:15am. Your VAT receipt comes separately from Stripe.

Can I use it for marketing?

Yes, for business-to-business contact, if you follow the rules. Most operators are companies, so you can contact them about things relevant to their business on a legitimate-interests basis: say who you are, give an easy way to opt out and honour it. 117 operators look like partnerships, sole traders or unverified names, and the file flags them: don't send those unsolicited marketing emails. Check phone numbers against TPS/CTPS before calling. See legitimate interests.

Can I share or resell the list?

You can use it across your own business, but you can't resell it, share it with other businesses or publish it. See the terms and licence.

Why are some plants missing capacity or a company?

Not every register gives a capacity, and we only add a Companies House number when the name match is strict. 562 plants (88%) have a capacity and 515 (81%) have a company number. The rest keep the operator name from the source.

What does AD confidence mean?

How sure we are that the site really is an anaerobic digestion plant. High means a register says so directly (e.g. REPD or Ofgem AD accreditation, or a permit that names AD): 442 plants. Medium-High (118) and Medium (78) are likely AD but not confirmed twice. Sites we think probably aren't AD (11) are left out.

Can I cancel the annual plan?

Yes, any time, from the link in your Stripe receipt or by emailing [email protected]. It then won't renew, and you keep the files you've had.

Still not sure?

Download the free sample to see real rows in every column (directors' names are removed from the sample), or email [email protected] and we'll answer within one working day.

Ready to buy?One-off £349 + VAT, or £495 + VAT a year with quarterly updates.
See prices and buy