Incinerators by status
These are energy-from-waste incinerators that burn residual waste to generate electricity, as the government's Renewable Energy Planning Database records them. 61 are operating, 55 more (1,626 MW) are consented or being built, and 29 applications were refused. Gasification and pyrolysis plants (advanced conversion) are counted separately: 20 operating, 18 consented or being built.
| Status | Projects | MW |
|---|---|---|
| Operational | 61 | 1,535 |
| Under construction | 20 | 645 |
| Consented, not yet built | 35 | 981 |
| Awaiting decision | 6 | 52 |
| Refused | 29 | 538 |
| Withdrawn | 18 | 314 |
| Permission expired | 13 | 153 |
| Abandoned | 11 | 133 |
| Revised (re-applied) | 18 | 491 |
| Decommissioned | 1 | 2 |
| No application needed | 1 | 28 |
| All | 213 | 4,871 |
Incinerators by region
South East has the most operating incinerators (11, 292 MW).
Operational incinerators by region
| Region | Incinerator projects | Operational | Operational MW | Consented or building | Pipeline MW | Awaiting decision |
|---|---|---|---|---|---|---|
| North East | 15 | 6 | 131 | 4 | 135 | 0 |
| North West | 19 | 3 | 144 | 5 | 150 | 1 |
| Yorkshire & Humber | 33 | 8 | 212 | 11 | 421 | 0 |
| East Midlands | 16 | 3 | 67 | 5 | 174 | 2 |
| West Midlands | 20 | 8 | 111 | 7 | 170 | 0 |
| East of England | 16 | 5 | 151 | 4 | 60 | 0 |
| London | 8 | 4 | 188 | 2 | 150 | 1 |
| South East | 31 | 11 | 292 | 4 | 161 | 0 |
| South West | 17 | 6 | 136 | 3 | 26 | 1 |
| Scotland | 19 | 5 | 58 | 7 | 160 | 1 |
| Wales | 14 | 2 | 46 | 2 | 2 | 0 |
| Northern Ireland | 5 | 0 | 0 | 1 | 15 | 0 |
Incinerators by size
The median operating incinerator generates 20 MW. Capacity is the electrical output in MW as the REPD records it, not the waste it can take: the REPD doesn't record tonnage.
Operational incinerators by capacity
Largest incinerators in the UK
The ten largest operating energy-from-waste incinerators by electrical capacity:
| Site | Operator company | Region | Status | MW |
|---|---|---|---|---|
| Runcorn EfW | Not matched | North West | Operational | 100.0 |
| Riverside Resource Recovery Facility (RRRF) | CORY ENVIRONMENTAL LIMITED | London | Operational | 72.0 |
| Ferrybridge Multifuel 2 (FM2) | Not matched | Yorkshire & Humber | Operational | 70.0 |
| Ferrybridge Multifuel 1 (FM1) | Not matched | Yorkshire & Humber | Operational | 68.0 |
| Rookery South | Not matched | East of England | Operational | 65.0 |
| Edmonton EcoPark EfW | Not matched | London | Operational | 55.0 |
| Wren Power and Pulp (Rivenhall Airfield) | Not matched | East of England | Operational | 55.0 |
| Allington EFW | KENT ENVIROPOWER LIMITED | South East | Operational | 51.0 |
| Fibrepower, Slough | Not matched | South East | Operational | 50.0 |
| K3 CHP Facility (Kemsley EfW) | Not matched | South East | Operational | 49.9 |
And the ten largest consented or under construction:
| Site | Operator company | Region | Status | MW |
|---|---|---|---|---|
| Boston Alternative Energy Facility (BAEF) | Not matched | East Midlands | Consented, not yet built | 102.0 |
| North Lincolnshire Green Energy Park | Not matched | Yorkshire & Humber | Consented, not yet built | 95.0 |
| South Humber Bank Power Station | Not matched | Yorkshire & Humber | Consented, not yet built | 95.0 |
| Riverside Energy Park (REP) | Not matched | London | Under construction | 80.5 |
| North London Heat and Power (Edmonton EcoPark Replacement) | Not matched | London | Under construction | 70.0 |
| Lostock | Not matched | North West | Under construction | 60.0 |
| Medworth EfW | MVV ENVIRONMENT LIMITED | East of England | Consented, not yet built | 58.0 |
| EMERGE (East Midlands Energy Re-Generation) | UNIPER UK LIMITED | East Midlands | Consented, not yet built | 49.9 |
| Medway One - Energy Hub | LOW CARBON LIMITED | South East | Consented, not yet built | 49.9 |
| Redcar Energy Centre | REDCAR HOLDINGS LIMITED | North East | Consented, not yet built | 49.9 |
Operator company is the Companies House name where the REPD operator matched one; "Not matched" means no strict match.
Combined heat and power
20 of the 61 operating incinerators are recorded as combined heat and power plants, supplying heat to a district network or a neighbouring factory as well as electricity. Across every status, 75 incinerator projects are CHP.
Incinerator planning decisions
Incinerators are among the most contested planning applications. Of the decided incinerator applications in the database, 79% were approved (139 approved, 36 refused), with a median of 327 days from application to decision. 6 are waiting for a decision now.
Incinerator permits
43 of the operating incinerators are matched to their Environment Agency permit in the list (England only), with the permit number, holder, permitted activities and the permit document. The register doesn't give permitted tonnage.
Incinerator operators
The companies with the most incinerator projects in the list, by Companies House name:
| # | Company (Companies House name) | Projects |
|---|---|---|
| 1 | VIRIDOR LIMITED | 10 |
| 2 | MVV ENVIRONMENT LIMITED | 5 |
| 3 | ENFINIUM ENERGY LIMITED | 3 |
| 4 | GRUNDON WASTE MANAGEMENT LIMITED | 3 |
| 5 | CORY ENVIRONMENTAL LIMITED | 2 |
| 6 | BRITANIACREST RECYCLING LIMITED | 2 |
| 7 | BRIDGWATER RESOURCE RECOVERY LIMITED | 2 |
| 8 | BIFFA LIMITED | 2 |
| 9 | BARR ENVIRONMENTAL LIMITED | 2 |
| 10 | POWYS ENVIRONMENTAL LIMITED | 2 |
Questions about incinerators in the UK
How many incinerators are there in the UK?
The Renewable Energy Planning Database (release of 13 November 2026) lists 61 operational energy-from-waste incinerators that generate electricity, with 1,535 MW between them, plus 20 operational gasification or pyrolysis plants. Small clinical or hazardous waste incinerators that don't export power aren't in the database.
What is the largest incinerator in the UK?
By electrical capacity, the largest operational energy-from-waste incinerator in the list is Runcorn EfW (100 MW, North West).
Where are most incinerators?
South East has the most operational incinerators: 11, with 292 MW.
How many new incinerators are planned?
20 energy-from-waste incinerators are under construction (645 MW), 35 have planning consent but haven't started (981 MW) and 6 are waiting for a decision (52 MW).
Do incinerators get planning permission?
Of the incinerator applications in the database that have been decided, 139 were approved at some stage and 36 refused, an approval rate of 79%. The median time from application to decision was 327 days.
Get the incinerator list
The energy from waste and advanced conversion pack has all 341 of these projects, every status, for £171 + VAT (£205.20), one-off. Buy the pack, or get the full list of every type:
Energy from waste and biomass list + quarterly updates
£549 a year
+ VAT (£658.80) a year
- The full UK energy from waste and biomass list now (Excel + CSV)
- 4 quarterly updates over the year
- A changes file each quarter: new projects and status changes
- Change vs last refresh column in every file
For £154 more than the one-off list you get the next four quarterly editions, each with a changes file. Renews yearly; cancel any time and keep the files you have had.
UK energy from waste and biomass plant list
£395
+ VAT (£474), one-off
- Every UK energy from waste, biomass and landfill gas project (Excel + CSV)
- Capacity, CHP, status, planning dates, EA permit, Ofgem output
- Operator company, Companies House details and parent company
One edition, dated 27 November 2026. No updates.
936 projects in the current edition. Pay by card through Stripe. Your files are emailed as a zip (Excel and CSV) within 15 minutes between 7am and 10pm; overnight orders arrive by 7:15am. Prices are plus VAT, which is added at checkout. You get a VAT receipt. For business buyers only; licensed for use in your own business.
See real rows in the free sample (directors' names removed).