Energy Sites DataBuy the list
Home › Energy from waste and biomass
Edition 27 November 2026 · updated quarterly

Energy from waste plants in the UK

Energy from waste plants in the UK: our list has 61 operational energy-from-waste incinerators and 20 gasification or pyrolysis plants, alongside 83 biomass power stations and 282 landfill and sewage gas sites: 936 projects in all, from operating plants to 152 consented or under construction and every application in the planning system. Each comes with its capacity, CHP flag, planning dates, location, permit and the operating company from Companies House.

  • Excel + CSV
  • MW, CHP, status, dates
  • EA permit + Ofgem output
  • Operator + parent company
UK energy from waste and biomass list
936projects
446operational
6,698 MWoperational capacity
One-off £395With quarterly updates £549/yrPacks from £145+ VAT
See prices and buy
Official public registersREPD, Environment Agency, Ofgem, LCCC, Companies House
Open Government LicenceOGL v3.0 and open data licences
Updated quarterlyRebuilt after each REPD release
Emailed within 15 minutes7am–10pm; overnight orders by 7:15am
Secure Stripe checkoutCard payment, VAT receipt

What you get

  • Every energy from waste, advanced conversion, biomass, landfill gas and sewage gas project in the government's Renewable Energy Planning Database: 936 projects across England, Scotland, Wales and Northern Ireland
  • Every planning status: 446 operational (6,698 MW), 152 consented or under construction, 10 awaiting a planning decision, plus refused, withdrawn and abandoned schemes
  • Three groups, also sold as packs: energy from waste and advanced conversion (341), biomass (290), landfill and sewage gas (305)
  • Electrical capacity in MW, a CHP flag, planning authority, application reference and every planning date
  • Address, county, region, postcode and map coordinates
  • The Environment Agency permit for 245 English sites (number, holder, permitted activities, permit document), Ofgem accreditation for 209 and RO output for 128, and the CfD contract for 15
  • The operator, with Companies House number, status, registered office, SIC codes, directors and parent company for 275 projects

Permit, Ofgem, CfD and grid details are matched from separate registers and labelled High or Medium confidence. No permitted tonnage (the registers don't publish it), no email addresses or phone numbers.

Prices for the UK energy from waste and biomass plant list

The annual plan suits anyone working the pipeline: every quarter projects are submitted, consented, start building, switch on or close, and the changes file tells you which.

Energy from waste and biomass list + quarterly updates

The full list now, then a fresh list every quarter for a year, with what changed

£549 a year

+ VAT (£658.80) a year

  • The full UK energy from waste and biomass list now (Excel + CSV)
  • 4 quarterly updates over the year
  • A changes file each quarter: new projects and status changes
  • Change vs last refresh column in every file
Subscribe

For £154 more than the one-off list you get the next four quarterly editions, each with a changes file. Renews yearly; cancel any time and keep the files you have had.

UK energy from waste and biomass plant list

Every UK energy-from-waste, biomass and landfill gas project today, one-off

£395

+ VAT (£474), one-off

  • Every UK energy from waste, biomass and landfill gas project (Excel + CSV)
  • Capacity, CHP, status, planning dates, EA permit, Ofgem output
  • Operator company, Companies House details and parent company
Buy now

One edition, dated 27 November 2026. No updates.

936 projects in the current edition. Pay by card through Stripe. Your files are emailed as a zip (Excel and CSV) within 15 minutes between 7am and 10pm; overnight orders arrive by 7:15am. Prices are plus VAT, which is added at checkout. You get a VAT receipt. For business buyers only; licensed for use in your own business.

What's in the fileReal column headings; cells shown as placeholders
uk-efw-biomass-sites.xlsx94 columnsASite nameBTechnologyCCapacity MWDCHPEStatus+89 more2345678Plantsuk-efw-biomass-sites.xlsx (more columns)94 columnsAEA permit numberBOutput MWh (Ofgem RO, Apr 2025-Mar 2026)+92 more2345678Plants

See real rows in the free sample (directors' names removed).

Packs: one type of plant

Energy from waste and advanced conversion pack 341 projects, £171; Biomass power stations pack 290 projects, £145; Landfill gas and sewage gas sites pack 305 projects, £153 (+ VAT, one-off).

PackProjectsPrice + VATBuy
Energy from waste and advanced conversion pack341£171Buy
Biomass power stations pack290£145Buy
Landfill gas and sewage gas sites pack305£153Buy

A pack is 50p a project, with a minimum of £129, plus VAT, worked out from the current edition. It has the same columns as the full list, for that type of plant only, every planning status. One-off: no quarterly updates. Emailed within 15 minutes between 7am and 10pm; overnight orders arrive by 7:15am.

What is in the energy from waste plants list

936projects, every status
446operational, 6,698 MW
152consented or under construction
275with the operator's company number

One row per project as the REPD records it, with what a supplier, contractor or investor needs before picking up the phone:

What you getProjectsWhere it comes from
The project: name, technology, capacity, CHP flag, status and date, planning authority, references and every planning date936Renewable Energy Planning Database (DESNZ), 911 with a capacity
Where it is: address, county, region, postcode, coordinates936REPD grid references; nearest postcode from postcodes.io for 508 that had none
Its environmental permit: number, holder, permitted activities, permit document245Environment Agency public register of installations (England; labelled match)
What it generates: Ofgem accreditation and output in MWh over a year209Ofgem Renewables and CHP Register (128 with RO output, April 2025 to March 2026)
Its subsidy contract: CfD round, contract MW, strike price15Low Carbon Contracts Company CfD register (every thermal contract checked by hand)
Grid connection: export MW, voltage, substation51Network operators' embedded capacity registers and the NESO TEC register (where published)
Who runs it: company number, status, registered office, SIC codes, directors, parent company275Companies House (strict match; parent company from the register of people with significant control, companies only: 203)

Energy from waste, biomass and landfill gas plants by technology

Landfill gas has the most operating sites (270), most of them gas engines of a few megawatts at closed or working landfills. Energy from waste incinerators are far bigger: the median operational incinerator is 20 MW, against 2.0 MW for landfill gas. Biomass ranges from farm and hospital boilers to Drax, the largest power station in the list. More on incinerators, biomass power stations and landfill gas sites.

TechnologyProjectsOperationalOperational MWConsented or buildingPipeline MWAwaiting decision
Energy from waste (incineration)213611,535551,6266
Advanced conversion (gasification / pyrolysis)12820229182890
Biomass (dedicated)286813,466761672
Biomass (co-firing)42663000
Landfill gas2932707553312
Sewage gas (sludge digestion)121250000
All9364466,6981522,11310

Projects by type

936projects
  • Energy from waste341
  • Biomass290
  • Landfill and sewage gas305

Energy from waste projects by planning status

73 energy from waste and advanced conversion projects (1,914 MW) have planning consent or are being built, and 6 are waiting for a decision. Across every type, 327 projects were refused, withdrawn, abandoned, decommissioned or lapsed: they stay in the list as history, because the same sites and applicants often come back.

StatusProjectsMW
Operational4466,698
Under construction37856
Consented, not yet built1151,257
Awaiting decision10321
Refused58993
Withdrawn561,424
Permission expired521,455
Abandoned1093,489
Revised (re-applied)44883
Decommissioned8790
No application needed128
All93618,193

Projects by planning status

936projects
  • Operational446
  • Consented or building152
  • Awaiting decision10
  • Refused, withdrawn or lapsed328

Projects in each UK nation

NationAllEnergy from wasteBiomassLandfill and sewage gasOperational MWPipeline MW
England7302762002546,0331,876
Scotland118365032432216
Wales722134172086
Northern Ireland168622615

Pipeline is consented or under construction. Energy from waste includes advanced conversion (gasification and pyrolysis); biomass includes co-firing.

Every UK energy from waste, biomass and landfill gas project in one spreadsheet936 projects with capacity, CHP, status, planning dates, permit and operator company. Or £549 a year for quarterly updates.
See prices and buy

Environmental permits

Every incinerator, large biomass plant and landfill in England needs an environmental permit from the Environment Agency. We match each English project to the EA's public register of installations by location and name and label the match: 245 projects have a permit (183 High matches), with the permit number, holder, the activities it allows (for example incineration of non-hazardous waste) and a link to the permit document. For landfill gas the permit is the landfill's, usually held by the landfill operator. The register doesn't publish permitted tonnage, so the file doesn't give one. Wales, Scotland and Northern Ireland permits aren't included yet.

Output and CfD contracts

209 projects are matched to an Ofgem accreditation, and 128 have the electricity they were issued Renewables Obligation certificates for between April 2025 and March 2026: 5.8 million MWh in total. Energy from waste earns ROCs only on its biomass share and most incinerators earn none, so for them the figure is blank or partial. 15 projects hold or held a Contract for Difference (5 live), with the round, contract capacity and strike price; every thermal CfD unit was checked by hand.

Operator companies

The REPD names 578 different operators or applicants. Many plants sit in their own project company, so the list adds the parent company from the Companies House register of people with significant control (companies only, never individuals) for 203 projects. The companies with the most energy from waste projects in the list, by their Companies House name:

#Company (Companies House name)Projects
1VIRIDOR LIMITED11
2MVV ENVIRONMENT LIMITED5
3ENFINIUM ENERGY LIMITED3
4GRUNDON WASTE MANAGEMENT LIMITED3
5BIFFA LIMITED3
6GRETTON BROOK ESTATES LIMITED2
7CORY ENVIRONMENTAL LIMITED2
8BRITANIACREST RECYCLING LIMITED2
9BRIDGWATER RESOURCE RECOVERY LIMITED2
10BARR ENVIRONMENTAL LIMITED2

Counts are projects whose REPD operator name matched that company; a group trading through many project companies appears under each one's own name.

Free sample

Download 20 real rows from the list, spread across the six technologies, the planning stages and the nations, picked to show the permit, output, CfD and company columns filled in. Directors' names have been removed from the free sample; the full list includes the directors of each operating company from Companies House. Across the whole list these columns are less complete than in the sample: see how complete it is.

Some of the rows in the sample:

SiteTypeStatusRegionMW
BH Energy Gap - Energy Recovery FacilityEnergy from wasteConsented, not yet builtYorkshire & Humber34.0
Kemsley MillEnergy from wasteRefusedSouth East75.0
Medway One - Energy HubEnergy from wasteConsented, not yet builtSouth East49.9
Melton Waste ParkEnergy from wasteConsented, not yet builtYorkshire & Humber22.0
Showground Road, Bridgwater Energy Recovery FacilityEnergy from wasteAwaiting decisionSouth West7.8
Energy Recovery Facility South StreetAdvanced conversionRefusedScotland12.0
Levenseat EfWAdvanced conversionOperationalScotland12.5
Cheddleton Industrial EstateBiomass (dedicated)AbandonedWest Midlands6.5

All the columns

The file has 94 columns. The Excel version has a Columns sheet explaining each one, and an About sheet with the sources and licences.

How complete the list is

DetailProjectsShare
Capacity (MW)91197%
Planning authority936100%
Planning application reference69574%
Map coordinates936100%
Postcode934100%
Environment Agency permit (England only)24526%
Ofgem accreditation20922%
Ofgem RO output12814%
CfD contract152%
Grid connection match515%
Companies House number27529%
Parent company20322%

Company numbers: 135 High matches (the exact registered name, or a name word plus a registered office at the site's postcode) and 140 Medium (a brand name that is exactly the name of an active energy, waste, construction or holding company). Postcodes for 508 projects are the nearest postcode to the REPD grid reference, flagged in the Postcode source column. Grid registers are only published for some network areas, so grid columns are sparse.

Using the data

The files are for your own business use: you can't resell or publish them. Directors are named as they appear on the public Companies House register. You can contact companies about things relevant to their business on a legitimate-interests basis: say who you are and where you got their details, offer an opt-out and honour it. 636 projects have an operator that may be an individual, a partnership or an unmatched name, and the file flags them: don't send them unsolicited marketing emails. Read the terms and our legitimate-interests note.

Questions about the energy from waste and biomass list

How many energy from waste plants are there in the UK?

The government's Renewable Energy Planning Database (release of 13 November 2026) lists 61 operational energy-from-waste incinerators (1,535 MW) and 20 operational advanced conversion (gasification or pyrolysis) plants (229 MW). A further 73 energy from waste projects are consented or under construction and 6 are waiting for a planning decision.

What exactly am I buying?

A spreadsheet (Excel and CSV) with one row for every energy from waste incineration, advanced conversion, dedicated biomass, biomass co-firing, landfill gas and sewage gas project in the Renewable Energy Planning Database: 936 projects in the current edition, dated 27 November 2026. Each row has the site, technology, capacity, CHP flag, planning status and dates, planning authority and reference, address, postcode and coordinates, the Environment Agency permit where we can match it, Ofgem output, any CfD contract, and the operator with its Companies House details and parent company.

Which statuses are included?

All of them. 446 projects are operational, 152 are consented or under construction, 10 are waiting for a planning decision and 327 were refused, withdrawn, abandoned, decommissioned, revised or have lapsed. The Status column says which, with the date.

Does it include permitted tonnage for incinerators?

No. The Environment Agency's public permit register gives the permit number, holder, permitted activities and a link to the permit document, but not the permitted tonnage, so we don't invent one. 245 English projects are matched to their permit; the permit document usually states the capacity. Wales, Scotland and Northern Ireland permits aren't included.

How accurate is the Ofgem output figure?

It is the electricity the station was issued Renewables Obligation certificates for between April 2025 and March 2026. That's the whole output for biomass, landfill gas and sewage gas stations, but only the biomass share for energy from waste, and most incinerators earn no ROCs at all, so the column is blank or partial for them. 128 projects have an output figure and 209 are matched to an Ofgem accreditation.

Is anaerobic digestion included?

No: anaerobic digestion plants are in our separate UK AD plant list. This list includes the 12 sewage sludge digestion projects the REPD records separately; 5 of them are within 1 km of a site in the AD list and are flagged in the 'Also in our AD plants list' column.

What's the difference between the full list, the annual plan and the packs?

The full list (£395 + VAT (£474)) is today's edition of every project. The annual plan (£549 a year + VAT (£658.80)) adds a fresh edition every quarter for a year after each REPD release, with a changes file listing new projects and status changes. Packs are one-off subsets at 50p a project (minimum £129): energy from waste and advanced conversion, biomass, or landfill and sewage gas.

How up to date is it?

This edition is dated 27 November 2026 and uses the REPD release published on 13 November 2026 (data to the end of September 2026), with the permit, Ofgem, CfD and Companies House data downloaded in the same week. We rebuild it every quarter after the next REPD release; the next edition is due in February 2027.

Does the free sample include directors?

No. Directors' names have been removed from the free sample: its Directors column says 'Removed in the free sample'. Every other column is exactly as in the paid file, and the full list includes the directors of each operating company from Companies House.

Can I use it for marketing?

Yes, for business-to-business contact, if you follow the rules. Many plants are run through their own project company, so the file gives the parent company from the Companies House register where there is one (203 projects). Say who you are, give an easy way to opt out and honour it. 636 projects have an operator we couldn't confirm as a company or public body, and the file flags them: don't send those unsolicited marketing emails.

Why do some projects have no company number?

The REPD records the operator or applicant as free text, often a brand or group name. We only add a Companies House number on a strict match: the exact registered name, a brand name that is exactly the name of an active energy, waste, construction or holding company (labelled Medium), or a name word plus a registered office at the site's postcode. 275 projects (29%) have a company number.

How do I get the files?

Pay by card on the Stripe checkout page. The files are emailed to you as a zip within 15 minutes between 7am and 10pm (UK time); orders placed overnight arrive by 7:15am. Your VAT receipt comes separately from Stripe.