What you get
- Every energy from waste, advanced conversion, biomass, landfill gas and sewage gas project in the government's Renewable Energy Planning Database: 936 projects across England, Scotland, Wales and Northern Ireland
- Every planning status: 446 operational (6,698 MW), 152 consented or under construction, 10 awaiting a planning decision, plus refused, withdrawn and abandoned schemes
- Three groups, also sold as packs: energy from waste and advanced conversion (341), biomass (290), landfill and sewage gas (305)
- Electrical capacity in MW, a CHP flag, planning authority, application reference and every planning date
- Address, county, region, postcode and map coordinates
- The Environment Agency permit for 245 English sites (number, holder, permitted activities, permit document), Ofgem accreditation for 209 and RO output for 128, and the CfD contract for 15
- The operator, with Companies House number, status, registered office, SIC codes, directors and parent company for 275 projects
Permit, Ofgem, CfD and grid details are matched from separate registers and labelled High or Medium confidence. No permitted tonnage (the registers don't publish it), no email addresses or phone numbers.
Prices for the UK energy from waste and biomass plant list
The annual plan suits anyone working the pipeline: every quarter projects are submitted, consented, start building, switch on or close, and the changes file tells you which.
Energy from waste and biomass list + quarterly updates
£549 a year
+ VAT (£658.80) a year
- The full UK energy from waste and biomass list now (Excel + CSV)
- 4 quarterly updates over the year
- A changes file each quarter: new projects and status changes
- Change vs last refresh column in every file
For £154 more than the one-off list you get the next four quarterly editions, each with a changes file. Renews yearly; cancel any time and keep the files you have had.
UK energy from waste and biomass plant list
£395
+ VAT (£474), one-off
- Every UK energy from waste, biomass and landfill gas project (Excel + CSV)
- Capacity, CHP, status, planning dates, EA permit, Ofgem output
- Operator company, Companies House details and parent company
One edition, dated 27 November 2026. No updates.
936 projects in the current edition. Pay by card through Stripe. Your files are emailed as a zip (Excel and CSV) within 15 minutes between 7am and 10pm; overnight orders arrive by 7:15am. Prices are plus VAT, which is added at checkout. You get a VAT receipt. For business buyers only; licensed for use in your own business.
See real rows in the free sample (directors' names removed).
Packs: one type of plant
Energy from waste and advanced conversion pack 341 projects, £171; Biomass power stations pack 290 projects, £145; Landfill gas and sewage gas sites pack 305 projects, £153 (+ VAT, one-off).
| Pack | Projects | Price + VAT | Buy |
|---|---|---|---|
| Energy from waste and advanced conversion pack | 341 | £171 | Buy |
| Biomass power stations pack | 290 | £145 | Buy |
| Landfill gas and sewage gas sites pack | 305 | £153 | Buy |
A pack is 50p a project, with a minimum of £129, plus VAT, worked out from the current edition. It has the same columns as the full list, for that type of plant only, every planning status. One-off: no quarterly updates. Emailed within 15 minutes between 7am and 10pm; overnight orders arrive by 7:15am.
What is in the energy from waste plants list
One row per project as the REPD records it, with what a supplier, contractor or investor needs before picking up the phone:
| What you get | Projects | Where it comes from |
|---|---|---|
| The project: name, technology, capacity, CHP flag, status and date, planning authority, references and every planning date | 936 | Renewable Energy Planning Database (DESNZ), 911 with a capacity |
| Where it is: address, county, region, postcode, coordinates | 936 | REPD grid references; nearest postcode from postcodes.io for 508 that had none |
| Its environmental permit: number, holder, permitted activities, permit document | 245 | Environment Agency public register of installations (England; labelled match) |
| What it generates: Ofgem accreditation and output in MWh over a year | 209 | Ofgem Renewables and CHP Register (128 with RO output, April 2025 to March 2026) |
| Its subsidy contract: CfD round, contract MW, strike price | 15 | Low Carbon Contracts Company CfD register (every thermal contract checked by hand) |
| Grid connection: export MW, voltage, substation | 51 | Network operators' embedded capacity registers and the NESO TEC register (where published) |
| Who runs it: company number, status, registered office, SIC codes, directors, parent company | 275 | Companies House (strict match; parent company from the register of people with significant control, companies only: 203) |
Energy from waste, biomass and landfill gas plants by technology
Landfill gas has the most operating sites (270), most of them gas engines of a few megawatts at closed or working landfills. Energy from waste incinerators are far bigger: the median operational incinerator is 20 MW, against 2.0 MW for landfill gas. Biomass ranges from farm and hospital boilers to Drax, the largest power station in the list. More on incinerators, biomass power stations and landfill gas sites.
| Technology | Projects | Operational | Operational MW | Consented or building | Pipeline MW | Awaiting decision |
|---|---|---|---|---|---|---|
| Energy from waste (incineration) | 213 | 61 | 1,535 | 55 | 1,626 | 6 |
| Advanced conversion (gasification / pyrolysis) | 128 | 20 | 229 | 18 | 289 | 0 |
| Biomass (dedicated) | 286 | 81 | 3,466 | 76 | 167 | 2 |
| Biomass (co-firing) | 4 | 2 | 663 | 0 | 0 | 0 |
| Landfill gas | 293 | 270 | 755 | 3 | 31 | 2 |
| Sewage gas (sludge digestion) | 12 | 12 | 50 | 0 | 0 | 0 |
| All | 936 | 446 | 6,698 | 152 | 2,113 | 10 |
Projects by type
- Energy from waste341
- Biomass290
- Landfill and sewage gas305
Energy from waste projects by planning status
73 energy from waste and advanced conversion projects (1,914 MW) have planning consent or are being built, and 6 are waiting for a decision. Across every type, 327 projects were refused, withdrawn, abandoned, decommissioned or lapsed: they stay in the list as history, because the same sites and applicants often come back.
| Status | Projects | MW |
|---|---|---|
| Operational | 446 | 6,698 |
| Under construction | 37 | 856 |
| Consented, not yet built | 115 | 1,257 |
| Awaiting decision | 10 | 321 |
| Refused | 58 | 993 |
| Withdrawn | 56 | 1,424 |
| Permission expired | 52 | 1,455 |
| Abandoned | 109 | 3,489 |
| Revised (re-applied) | 44 | 883 |
| Decommissioned | 8 | 790 |
| No application needed | 1 | 28 |
| All | 936 | 18,193 |
Projects by planning status
- Operational446
- Consented or building152
- Awaiting decision10
- Refused, withdrawn or lapsed328
Projects in each UK nation
| Nation | All | Energy from waste | Biomass | Landfill and sewage gas | Operational MW | Pipeline MW |
|---|---|---|---|---|---|---|
| England | 730 | 276 | 200 | 254 | 6,033 | 1,876 |
| Scotland | 118 | 36 | 50 | 32 | 432 | 216 |
| Wales | 72 | 21 | 34 | 17 | 208 | 6 |
| Northern Ireland | 16 | 8 | 6 | 2 | 26 | 15 |
Pipeline is consented or under construction. Energy from waste includes advanced conversion (gasification and pyrolysis); biomass includes co-firing.
Environmental permits
Every incinerator, large biomass plant and landfill in England needs an environmental permit from the Environment Agency. We match each English project to the EA's public register of installations by location and name and label the match: 245 projects have a permit (183 High matches), with the permit number, holder, the activities it allows (for example incineration of non-hazardous waste) and a link to the permit document. For landfill gas the permit is the landfill's, usually held by the landfill operator. The register doesn't publish permitted tonnage, so the file doesn't give one. Wales, Scotland and Northern Ireland permits aren't included yet.
Output and CfD contracts
209 projects are matched to an Ofgem accreditation, and 128 have the electricity they were issued Renewables Obligation certificates for between April 2025 and March 2026: 5.8 million MWh in total. Energy from waste earns ROCs only on its biomass share and most incinerators earn none, so for them the figure is blank or partial. 15 projects hold or held a Contract for Difference (5 live), with the round, contract capacity and strike price; every thermal CfD unit was checked by hand.
Operator companies
The REPD names 578 different operators or applicants. Many plants sit in their own project company, so the list adds the parent company from the Companies House register of people with significant control (companies only, never individuals) for 203 projects. The companies with the most energy from waste projects in the list, by their Companies House name:
| # | Company (Companies House name) | Projects |
|---|---|---|
| 1 | VIRIDOR LIMITED | 11 |
| 2 | MVV ENVIRONMENT LIMITED | 5 |
| 3 | ENFINIUM ENERGY LIMITED | 3 |
| 4 | GRUNDON WASTE MANAGEMENT LIMITED | 3 |
| 5 | BIFFA LIMITED | 3 |
| 6 | GRETTON BROOK ESTATES LIMITED | 2 |
| 7 | CORY ENVIRONMENTAL LIMITED | 2 |
| 8 | BRITANIACREST RECYCLING LIMITED | 2 |
| 9 | BRIDGWATER RESOURCE RECOVERY LIMITED | 2 |
| 10 | BARR ENVIRONMENTAL LIMITED | 2 |
Counts are projects whose REPD operator name matched that company; a group trading through many project companies appears under each one's own name.
Free sample
Download 20 real rows from the list, spread across the six technologies, the planning stages and the nations, picked to show the permit, output, CfD and company columns filled in. Directors' names have been removed from the free sample; the full list includes the directors of each operating company from Companies House. Across the whole list these columns are less complete than in the sample: see how complete it is.
Some of the rows in the sample:
| Site | Type | Status | Region | MW |
|---|---|---|---|---|
| BH Energy Gap - Energy Recovery Facility | Energy from waste | Consented, not yet built | Yorkshire & Humber | 34.0 |
| Kemsley Mill | Energy from waste | Refused | South East | 75.0 |
| Medway One - Energy Hub | Energy from waste | Consented, not yet built | South East | 49.9 |
| Melton Waste Park | Energy from waste | Consented, not yet built | Yorkshire & Humber | 22.0 |
| Showground Road, Bridgwater Energy Recovery Facility | Energy from waste | Awaiting decision | South West | 7.8 |
| Energy Recovery Facility South Street | Advanced conversion | Refused | Scotland | 12.0 |
| Levenseat EfW | Advanced conversion | Operational | Scotland | 12.5 |
| Cheddleton Industrial Estate | Biomass (dedicated) | Abandoned | West Midlands | 6.5 |
All the columns
The file has 94 columns. The Excel version has a Columns sheet explaining each one, and an About sheet with the sources and licences.
- REPD ref
- Site name
- Technology
- Type group
- Capacity MW
- Capacity band
- CHP
- Heat network ref (REPD)
- Status
- Pipeline
- Status date
- Status (REPD wording)
- Planning authority
- Planning application ref
- Appeal ref
- Secretary of State ref
- Application submitted
- Permission granted
- Permission refused
- Application withdrawn
- Appeal lodged
- Appeal decided
- Permission expired
- Construction started
- Operational since
- Re-application (new REPD ref)
- Re-application (old REPD ref)
- Address
- County
- Region
- Nation
- Postcode
- Postcode source
- Latitude
- Longitude
- Easting
- Northing
- Operator / applicant
- Company number
- CH registered name
- CH status
- CH registered office
- Incorporated
- SIC codes
- Directors
- Parent company
- Parent company number
- Entity type
- CH match
- Email marketing rule (PECR)
- EA permit number
- EA permit holder
- EA permitted activities
- EA permit date
- EA permit document
- EA permit match
- Output MWh (Ofgem RO, Apr 2025-Mar 2026)
- Output months reported
- Ofgem scheme
- Ofgem accreditation
- Ofgem station name
- Ofgem generation type
- Ofgem DNC MW
- Ofgem match
- CfD round
- CfD contract MW
- CfD strike price £/MWh (round base-year prices)
- CfD delivery year
- CfD status (LCCC)
- CfD expected start
- CfD generation last year MWh (LCCC)
- CfD units
- CfD match
- Grid network
- Grid register
- Grid register ref
- Grid site name
- Export capacity MW
- Import capacity MW
- Connection voltage kV
- Substation
- Connection status
- Connection date
- Grid match
- CfD round (REPD)
- RO banding ROC/MWh (REPD)
- FiT tariff p/kWh (REPD)
- Community scheme
- Also in our AD plants list
- REPD record updated
- REPD edition
- Sources
- Notes
- Change vs last refresh
How complete the list is
| Detail | Projects | Share |
|---|---|---|
| Capacity (MW) | 911 | 97% |
| Planning authority | 936 | 100% |
| Planning application reference | 695 | 74% |
| Map coordinates | 936 | 100% |
| Postcode | 934 | 100% |
| Environment Agency permit (England only) | 245 | 26% |
| Ofgem accreditation | 209 | 22% |
| Ofgem RO output | 128 | 14% |
| CfD contract | 15 | 2% |
| Grid connection match | 51 | 5% |
| Companies House number | 275 | 29% |
| Parent company | 203 | 22% |
Company numbers: 135 High matches (the exact registered name, or a name word plus a registered office at the site's postcode) and 140 Medium (a brand name that is exactly the name of an active energy, waste, construction or holding company). Postcodes for 508 projects are the nearest postcode to the REPD grid reference, flagged in the Postcode source column. Grid registers are only published for some network areas, so grid columns are sparse.
Using the data
The files are for your own business use: you can't resell or publish them. Directors are named as they appear on the public Companies House register. You can contact companies about things relevant to their business on a legitimate-interests basis: say who you are and where you got their details, offer an opt-out and honour it. 636 projects have an operator that may be an individual, a partnership or an unmatched name, and the file flags them: don't send them unsolicited marketing emails. Read the terms and our legitimate-interests note.
Questions about the energy from waste and biomass list
How many energy from waste plants are there in the UK?
The government's Renewable Energy Planning Database (release of 13 November 2026) lists 61 operational energy-from-waste incinerators (1,535 MW) and 20 operational advanced conversion (gasification or pyrolysis) plants (229 MW). A further 73 energy from waste projects are consented or under construction and 6 are waiting for a planning decision.
What exactly am I buying?
A spreadsheet (Excel and CSV) with one row for every energy from waste incineration, advanced conversion, dedicated biomass, biomass co-firing, landfill gas and sewage gas project in the Renewable Energy Planning Database: 936 projects in the current edition, dated 27 November 2026. Each row has the site, technology, capacity, CHP flag, planning status and dates, planning authority and reference, address, postcode and coordinates, the Environment Agency permit where we can match it, Ofgem output, any CfD contract, and the operator with its Companies House details and parent company.
Which statuses are included?
All of them. 446 projects are operational, 152 are consented or under construction, 10 are waiting for a planning decision and 327 were refused, withdrawn, abandoned, decommissioned, revised or have lapsed. The Status column says which, with the date.
Does it include permitted tonnage for incinerators?
No. The Environment Agency's public permit register gives the permit number, holder, permitted activities and a link to the permit document, but not the permitted tonnage, so we don't invent one. 245 English projects are matched to their permit; the permit document usually states the capacity. Wales, Scotland and Northern Ireland permits aren't included.
How accurate is the Ofgem output figure?
It is the electricity the station was issued Renewables Obligation certificates for between April 2025 and March 2026. That's the whole output for biomass, landfill gas and sewage gas stations, but only the biomass share for energy from waste, and most incinerators earn no ROCs at all, so the column is blank or partial for them. 128 projects have an output figure and 209 are matched to an Ofgem accreditation.
Is anaerobic digestion included?
No: anaerobic digestion plants are in our separate UK AD plant list. This list includes the 12 sewage sludge digestion projects the REPD records separately; 5 of them are within 1 km of a site in the AD list and are flagged in the 'Also in our AD plants list' column.
What's the difference between the full list, the annual plan and the packs?
The full list (£395 + VAT (£474)) is today's edition of every project. The annual plan (£549 a year + VAT (£658.80)) adds a fresh edition every quarter for a year after each REPD release, with a changes file listing new projects and status changes. Packs are one-off subsets at 50p a project (minimum £129): energy from waste and advanced conversion, biomass, or landfill and sewage gas.
How up to date is it?
This edition is dated 27 November 2026 and uses the REPD release published on 13 November 2026 (data to the end of September 2026), with the permit, Ofgem, CfD and Companies House data downloaded in the same week. We rebuild it every quarter after the next REPD release; the next edition is due in February 2027.
Does the free sample include directors?
No. Directors' names have been removed from the free sample: its Directors column says 'Removed in the free sample'. Every other column is exactly as in the paid file, and the full list includes the directors of each operating company from Companies House.
Can I use it for marketing?
Yes, for business-to-business contact, if you follow the rules. Many plants are run through their own project company, so the file gives the parent company from the Companies House register where there is one (203 projects). Say who you are, give an easy way to opt out and honour it. 636 projects have an operator we couldn't confirm as a company or public body, and the file flags them: don't send those unsolicited marketing emails.
Why do some projects have no company number?
The REPD records the operator or applicant as free text, often a brand or group name. We only add a Companies House number on a strict match: the exact registered name, a brand name that is exactly the name of an active energy, waste, construction or holding company (labelled Medium), or a name word plus a registered office at the site's postcode. 275 projects (29%) have a company number.
How do I get the files?
Pay by card on the Stripe checkout page. The files are emailed to you as a zip within 15 minutes between 7am and 10pm (UK time); orders placed overnight arrive by 7:15am. Your VAT receipt comes separately from Stripe.